Newly designs itself can have the question occurrence which many flaws and has not been
able to expect, only has after these flaws and the question are solved, can manifest new
goods come into the market the product superiority. Therefore, a performance superior
product is born at the same time, also is following a higher risk. Should emphasize, if
designs itself does not request to use the brand-new method, is not unnecessary merely for
the goal which transform to use the new method.
In the design preliminary stage, should allow to design the personnel fully to display
the creativity, not each kind of restraint. Even if has had many impractical ideas, also can
in the design early time, namely in front of the plan blueprint is corrected. Only then, only
then does not send to stops up the innovation the mentality. Usually, must propose several
sets of design proposals, then perform the comparison. Has the possibility very much in the
plan which finally designated, has used certain not in plan some ideas which accepts.
How does the psychologist frequently discuss causes the machine which the people
adapts them to operate. Designs personnel''s basic responsibility is diligently causes the
machine to adapt the people. This certainly is not an easy work, because certainly does not
have to all people to say in fact all is the most superior operating area and the operating
process.
Another important question, project engineer must be able to carry on the exchange
and the consultation with other concerned personnel. In the initial stage, designs the
personnel to have to carry on the exchange and the consultation on the preliminary design
with the administrative personnel, and is approved. This generally is through the oral
discussion, the schematic diagram and the writing material carries on. In order to carry on
the effective exchange, needs to solve the following problem:
(1) designs whether this product truly does need for the people? Whether there is
competitive ability
(2) does this product compare with other companies'' existing similar products?
(3) produces this kind of product is whether economical?
(4) product service is whether convenient?
(5) product whether there is sale? Whether may gain?
Only has the time to be able to produce the correct answer to above question. But, the
product design, the manufacture and the sale only can in carry on to the above question
preliminary affirmation answer foundation in. Project engineer also should through the
detail drawing and the assembly drawing, carries on the consultation together with the
branch of manufacture to the finally design proposal.
Usually, can have some problem in the manufacture process. Possibly can request to
some components size or the common difference makes some changes, causes the
components the production to change easily. But, in the project change must have to pass
through designs the personnel to authorize, guaranteed cannot damage the product the
function. Sometimes, when in front of product assembly or in the packing foreign shipment
experiment only then discovers in the design some kind of flaw. These instances exactly