Boom mounted on the upper part of the rotation of the tall tower crane. Operating a large space,
mainly used for housing construction materials in the vertical and horizontal transportation and
installation of building components. From the metal structure, working bodies and the electrical
system consists of three parts. Metal structure including the tower moving arms and base and so
on. The work of organizations including lifting,luffing, slewing and walking four parts. Electrical
systems including motors, controllers, power distribution cabinets, connection lines, signals and
lighting devices.
Short tower crane tower crane, also known as tower crane, originated in Western Europe.
According to records, the first tower crane used in construction related to the patent granted in
1900. Emerged in 1905 with a fixed jib tower crane, and in 1923 produced the prototype of
modern tower crane, in the same year the first relatively complete modern tower crane. 1930,
when Germany began mass production of tower cranes, and used for building construction. In
1941, the tower crane industry standard DIN8770 published in Germany. The standard provides
for crane set (t) and amplitude (m) of the product (tm) together to re-torque, said the tower crane
lifting capacity.
China tower crane industry in the 20th century, 50 years started, as opposed to the Western
European countries due to weakness in the construction industry caused by the tower crane
industry in recession, Shanghai Poch Drive System Co., Ltd. tower crane industry in China is in a
rapid period of development .
From the tower crane in terms of technological development, while an endless stream of new
products, new products in the production efficiency, easy operation, and maintenance easier and
more reliable operation in the increase in the tower crane, but there is no fundamental change in
the technology. The tower crane research is towards modular development. The so-called modular,
that is, to the tower structure as the core, according to structural and functional characteristics of
the shaft broken down into several parts, and on the basis of seriation and general requirements,
follow the modulus of the various parts of the system theory and then divided into a number of
modules. According to parameters required, choose the appropriate modules were grouped with
different performance characteristics of the tower crane technology to meet the specific needs of
the construction. The implementation of modular tower crane tower crane production capacity will
help to speed up the development progress of Lu, save product development costs, and better for
customer service.
Slewing tower crane be divided into upper and lower rotary tower crane tower crane two broad
categories. In which the carrying capacity of the former than the latter, in many we have seen the
construction site is on a rotary festival add up on top of a high tower crane access. According to
whether the move is further divided into: walking a line, and fixed. Fixed the fixed tower crane
tower do not switch installed in the concrete block foundation, or installed in the form of X-
shaped concrete foundation. In the housing construction generally use a fixed style.
Device characteristics and safety devices
Tower crane boom and struts form of sub-horizontal type two kinds. For the horizontal boom, the
load car runs along the level luffing boom, luffing movement balance, its long boom, but the
greater weight boom. Boom for the strut-type when the tractor boom luffing mechanism Pitch
amplitude, amplitude motion than horizontal steady, but its relatively small weight.
In order to ensure the safety of tower crane has a good safety device, such as starting weight,
range, height and load torque constraints such devices, as well as the travel limit switches, tower
lights, wind instrument, wind clip-rail device, Ladders and athletic supporter circle, walkways and
railings. Driver's cab demand for comfort, easy operation, good vision and good communications
equipment.
Production points of the inspection of tower cranes
1) Check the structural condition of metal, especially high-strength bolts, which connect the
surface to be cleared of dust, paint, no trace, and rust, and the use of hand or special torque
wrench, according to assembly requirements tightened.
2) Check the transmission of various agencies, including the work of transmission suitability of
the bearing clearance, the gear mesh is not good and the brake is sensitive.
3) Check the wear of steel wire rope and pulleys, fixed is reliable.
4) Check the electrical components are good contact points of the closure were the extent of
follow-correct and reliable.
5) Check whether the running wheel and rail access to good, clip-rail clamp is reliable. The
installation of attachment devices, within the climbing device, the connecting bolts and the clip
block is solid and reliable.
Used tower crane
The following specific description in several aspects of the tower crane used room Jianzhong.
(A), the tower crane metal structure
The metal structure is composed of tower crane boom, tower, turret, bearings, balance arm,
chassis, composed of apex.
Construction boom level luffing jib type of car, and then have a single hanging point down the
minutes, double-hanging point and the lifting arm and balance arm fused hammerhead-type level
luffing jib car. Single hanging point is statically determinate structure, twin-lift point is statically
indeterminate structure. Hammerhead-type trolley level luffing jib installed at the tower top
Zhuangruo hammer, shaft, such as hammer handle, no spire, it is also known as flat head style.
Flat-style of making structure simpler and more conducive to the force, to reduce weight and
simplify construction and so on. Most used car luffing jib equilateral triangle cross-section.
Tower structure, also known as the tower is the main body of the tower crane structure. Now adopt
a square cross-section of tower crane, application of a broader cross-section dimensions are: 1.2m
× 1.2m, 1.4m × 1.4m, 1.6m × 1.6m, 2.0m × 2.0m; tower section used the standard size is 2.5m and
the 3m. Tower sections used in the standard connection method is to cover the most widely used
set of stud bolt connection and connection, followed by the pin connection and flashboard pin
socket connection. Standards Section has the overall standards of style tower-type tower sections
and assembled the standard sections, the latter high precision machining, production difficult, but
the stacking area is small, less freight. Ladder tower section must be set so that driver and
mechanic from top to bottom. Ladder width of not less than 500mm, ladder step spacing of not
more than 300mm, set up a guard ring for each 500mm. When the ladder height of more than 10m,
the ladder should be sub-switching, the switching office to install a closed platform.
Spire function is to bear arm and balance arm Cord Cord coming from the upper load, and through
rotating tower, turret, bearings and other structural components-style passing directly through the
turret to the tower structure. Since l have truncated conical tower column, forward or backward
truncated cone column, Renzi Jia style and bracing Shelf.
Any slewing tower cranes are required to set up a balance weight, its function is to balance the
weight bearing, which constitute the design required by the role of torque in the opposite direction
and lifting the balance of torque. In addition to balance the weight, but also often installed in its
rear lifting mechanism. Lifting bodies are placed, together with the balance weight arm in
balancing the tail end of a re-allocation of the Department can play a role, two rope reel and the
spire increase the distance between the guide wheel to facilitate the rope around and avoid the
occurrence of emission the phenomenon of chaos rope. Balance the weight and balance amount is
inversely proportional to the relationship between the length of the arm, while the balance of arm
length and boom there is a certain percentage of the length of the relationship in between. Balance
the considerable amount of heavy, light tower crane usually at least 3 ~ 4t, heavy to almost 30t.
Balance weight can be made of cast iron or reinforced concrete: the high cost of the former
process, but the small size wind; the latter were large in size to the stability of the windward big
negative, but the simple economy, it is generally use this. The usual practice is to balance the
emphasis on pre-divided into 2 http://www.pohu-drive.com ~ 3 kinds of specifications, width,
thickness of the same, but the height should be adjusted to match the use of different arm lengths.
(B), the tower crane spare parts
Each tower crane must be used in many kinds of lifting parts, of which the largest number of
technical requirements are strict and complicated rope specifications. Tower crane wire rope used
in accordance with different functions are: lifting wire rope, rope luffing, jib ropes, balance the
摘要:

英文原文TowerCraneBoommountedontheupperpartoftherotationofthetalltowercrane.Operatingalargespace,mainlyusedforhousingconstructionmaterialsintheverticalandhorizontaltransportationandinstallationofbuildingcomponents.Fromthemetalstructure,workingbodiesandtheelectricalsystemconsistsofthreeparts.Metalstructu...

展开>> 收起<<
塔式起重机外文文献翻译、中英文翻译.doc

共11页,预览4页

还剩页未读, 继续阅读

作者:设计吧 分类:课程设计课件资料 价格:10光币 属性:11 页 大小:69KB 格式:DOC 时间:2023-02-13

开通VIP享超值会员特权

  • 多端同步记录
  • 高速下载文档
  • 免费文档工具
  • 分享文档赚钱
  • 每日登录抽奖
  • 优质衍生服务
/ 11
客服
关注