Flat-style of making structure simpler and more conducive to the force, to reduce weight and
simplify construction and so on. Most used car luffing jib equilateral triangle cross-section.
Tower structure, also known as the tower is the main body of the tower crane structure. Now adopt
a square cross-section of tower crane, application of a broader cross-section dimensions are: 1.2m
× 1.2m, 1.4m × 1.4m, 1.6m × 1.6m, 2.0m × 2.0m; tower section used the standard size is 2.5m and
the 3m. Tower sections used in the standard connection method is to cover the most widely used
set of stud bolt connection and connection, followed by the pin connection and flashboard pin
socket connection. Standards Section has the overall standards of style tower-type tower sections
and assembled the standard sections, the latter high precision machining, production difficult, but
the stacking area is small, less freight. Ladder tower section must be set so that driver and
mechanic from top to bottom. Ladder width of not less than 500mm, ladder step spacing of not
more than 300mm, set up a guard ring for each 500mm. When the ladder height of more than 10m,
the ladder should be sub-switching, the switching office to install a closed platform.
Spire function is to bear arm and balance arm Cord Cord coming from the upper load, and through
rotating tower, turret, bearings and other structural components-style passing directly through the
turret to the tower structure. Since l have truncated conical tower column, forward or backward
truncated cone column, Renzi Jia style and bracing Shelf.
Any slewing tower cranes are required to set up a balance weight, its function is to balance the
weight bearing, which constitute the design required by the role of torque in the opposite direction
and lifting the balance of torque. In addition to balance the weight, but also often installed in its
rear lifting mechanism. Lifting bodies are placed, together with the balance weight arm in
balancing the tail end of a re-allocation of the Department can play a role, two rope reel and the
spire increase the distance between the guide wheel to facilitate the rope around and avoid the
occurrence of emission the phenomenon of chaos rope. Balance the weight and balance amount is
inversely proportional to the relationship between the length of the arm, while the balance of arm
length and boom there is a certain percentage of the length of the relationship in between. Balance
the considerable amount of heavy, light tower crane usually at least 3 ~ 4t, heavy to almost 30t.
Balance weight can be made of cast iron or reinforced concrete: the high cost of the former
process, but the small size wind; the latter were large in size to the stability of the windward big
negative, but the simple economy, it is generally use this. The usual practice is to balance the
emphasis on pre-divided into 2 http://www.pohu-drive.com ~ 3 kinds of specifications, width,
thickness of the same, but the height should be adjusted to match the use of different arm lengths.
(B), the tower crane spare parts
Each tower crane must be used in many kinds of lifting parts, of which the largest number of
technical requirements are strict and complicated rope specifications. Tower crane wire rope used
in accordance with different functions are: lifting wire rope, rope luffing, jib ropes, balance the